180­0 21 21 000
+91­ 844 732 0000
Project

Tulip Violet

Sector 69, Golf Course Extension, Gurgaon - ID: PJ96

View Developer Map View
Brochure

BSP 1.1 Cr - 1.4 Cr

last updated on 09-Sep-2013
Payment Plan Price Breakup
 

Updates

  • Bijender Bijender |  11:36 AM, Aug 13, 2013
    Construction Update : Recent Photographs of Tulip Violet
  • Surjeet Surjeet |  08:18 AM, Aug 12, 2013
    Construction Update : Recent Photographs of Tulip Violet
  • Surjeet Surjeet |  11:10 AM, Mar 22, 2013
    Recent Photograph of Tulip Violet
Post Updates   More Updates

Introduction: Tulip Violet spread across verdant landscapes is a thoughtfully designed residential project. With tranquility and undulating lawns, this gated community makes an enviable residential address. The project has Vaastu compliant layout.


Location: The project site is placed in Sector 69 which forms a part of Gurgaon. It is in Gurgaon's suburban regions called Golf Course Extension. The new corridor connects the popular stretches of Golf Course Road and Sohna Road. The project is connected to important areas via 60 metre wide road. National Highway No. 8 (NH-8) and proposed metro also lie at a short distance which further boost connectivity. Congestion free travelling experience is the locational USP of this project. Within a short duration of 20 minutes, one can reach the Indira Gandhi International Airport from the stretch of Golf Course Extension Road. This project is located near Tulip White, Unitech Sunbreeze and Tulip Purple.


Available units: Residential options available here include 2BHK, 3BHK and 4BHK apartment. Areas of these vary from 1578 square feet to 2010 square feet respectively. Buyers would be attracted to this project due to its easy and flexible payment plan.


Interior Specifications: State-of-the-art interior specifications of abodes will make you feel proud on your choice. Spacious balconies have great seating facility too. You would love to spend some extra time in modular kitchen and impress your loved ones with their favorite delicacies. Flats here have been finished to a very high standard with designer flooring. In all the bedrooms space has been provided for wardrobes. Nice and well planned floor plan provides an excellent place to live. Download Tulip Violet brochure from Favista for detailed information.


Amenities: To make life easy and comfortable at Tulip Violet, the developer has proposed numerous amenities. Some examples are reserved parking, swimming pool, community party area, park, worship place, tennis court, kid's play area, grocery store and tree lined avenues and pathways. This gated community has high-level of security measures. Fire sprinklers, fire detectors, CCTV cameras, boom barriers at entry and exit, etc. are the systems installed to ensure safety of residents of Tulip Violet.


Developer: The credit of Tulip Violet goes to Tulip Infratech Pvt.Ltd.. The developer has several projects in the same city like Tulip Petals and Tulip Orange.


Current Status: Under construction. You can also check images of the project with latest construction status. Keep yourself updated on current price, project/builder reviews, construction status and possession related information.


Possession Date: The Project is expected to be completed by 2014-03-31.


Download : Tulip Violet Brochure
 

Available Units

Original Bookings (For Sale by Builder)
BHK SIZE (SFT) PRICE/SFT PRICE*
3 1,578 7,000 1.1 Cr
 
Resale (For Sale by Owner)
BHK SIZE (SFT) PRICE/SFT PRICE*
3 1,578 5,700 89.9 L
3 1,578 5,513 87 L
3 1,578 5,700 89.9 L
3 1,578 5,700 89.9 L
3 1,578 5,596 88.3 L
3 1,578 5,900 93.1 L
4 2,010 7,000 1.4 Cr
4 2,010 5,700 1.1 Cr
4 2,010 5,700 1.1 Cr
 

Map

Tulip Violet
1.1 Cr
Sector 69, Gurgaon
Introduction: Tulip Violet spread across verdant landsc..
 

Site Plan / Floor Plan

 

Project Specifications

AMENITIES AT PROJECT / SOCIETY LEVEL
Garbage disposal on each floor, 24/7 Water Supply, Swimming Pool, Badminton/Tennis Court, Community Party Area, Kids Play Area(swing & slide) , Garden/Park, Reserved parking for each unit, Additional assigned parking, Available Parking Types : Open, Covered, Basement, Grocery Store, Place of worship, ATM within campus, Rainwater Harvesting/Water Treatment, Sewage Treatment
SECURITY AND SAFETY FEATURES
7.5
Security staff at main gate with register, Security staff at apartment tower, Earthquake resistant
MAINTENANCE
Lifts & Safety equipment checked : Last 3 Months, Onsite Electrician/Plumber , Response time for onsite complaints : Good, Electrical/Plumbing/Sewage Condition : Good, Exterior Paint : Good
STYLE
7.0
Lobby Area : Lobby Type : Single Floor , Size :< 15 x 15 , Granite/Marble/Wood/Glass , Airconditioned
Lift Lobby: Size : < 8 x 8 , Granite/Marble/Wood/Glass , Airconditioned
Building Exterior: Building Name/Signages clearly visible , Hidden AC Unit/ducts provided , Themed Exterior
Community Centre : Lighted 23m or larger pool , Indoor Badminton/Squash Court
Open Area : Manicured Garden , Lighted roads with walk trails , Benches & night lighting , Fountain with lights , Basement Parking
Brand Recognition : Top 10 developers of the city, Well advertized community
 

Price Breakup

 

B.S.P                                : Rs. 7000/sq.ft.

E.D.C/I.D.C                     : Rs. 325/sq.ft.

Open Car Parking         : Rs. 1.75 lacs

Covered Car Parking   : Rs. 3.50 lacs

(Mendatory one covered car parking for 3 BHK and 4BHK and open car parking for 4BHK)

 

Preferential Location Charges (P.L.C)

Ground Floor                 : Rs. 100/sq.ft.

Park Facing                   : Rs. 75/sq.ft.

1st Floor                          : Rs. 75/sq.ft.

2nd Floor                        : Rs. 60/sq.ft.

3rd Floor                         : Rs. 50/sq.ft.

Top Floor                       : Rs. 100/sq.ft.

 

Payment Plan

1.      Construction Linked Plan

10% of B.S.P at the time of Booking

10% of B.S.P within 60 days from Booking

10% of B.S.P within 90 days from Booking

10% of B.S.P and 50% of EDC/IDC within 5 month from Booking

10% of B.S.P and 50% of EDC/IDC within 7 month from Booking

10% of B.S.P and 50% of Car Parking within 9 month from Booking

10% of B.S.P and 50% of Car Parking within 11 month from Booking

  7% of B.S.P within 13 Months from Booking

  6% of B.S.P on Start of Twelveth Floor Roof Slab

  6% of B.S.P on Start of Internal Plaster

  6% of B.S.P on Start of Flooring

  5% of B.S.P + other Charges at the time of offer of Possession

 

Updates / Reviews

userdummy
Update Type: Construction Price
Upload Images
POST
Bijender Bijender   |  Updated on 11:36 AM, Aug 13, 2013 Construction Update :   Recent Photographs of Tulip Violet
Surjeet Surjeet   |  Updated on 08:18 AM, Aug 12, 2013 Construction Update :   Recent Photographs of Tulip Violet
Surjeet Surjeet   |  Updated on 11:10 AM, Mar 22, 2013   Recent Photograph of Tulip Violet
Surjeet Surjeet   |  Updated on 11:09 AM, Mar 22, 2013   Recent Photographs of Tulip Violet
 
I am Interested

We can CALL YOU NOW* FOR TULIP VIOLET

 
*10 AM to 8 PM IST
 
Your number is secure with us. We don't share your number with any third party.

Hot Projects

Tata La Vida

Supertech Azaliya

Gurgaon Gateway

Central Park 3

Uppal G99

Vipul Aarohan

Vatika The Turning Point

Similar Projects

Vatika Tranquil Heights

Burman GSC Spectrum Centre

Garden Vista

DLF The Primus

Vatika Sovereign Next

* Prices are subject to change.